June 2016
May 2016
Some more basic necklaces, was also doing a square plate at the same time.
December 2015
Making some glass necklaces, some with a hole drilled for the string to go though and the rest have bails glued onto them.
Above are the base pieces of glass, a diamond ring saw was used to cut out the ones which are not square and to the left the frit
has been placed on top of the base glass.
Above are the finished fused pieces and to the right some weight on top of the bails as the araldite glue dries for 4 days. Below are
several finished pieces.